If you wish to make donation please use the Bank Details below. Any donation of funds will be greatly appreciated and will be used for the medical centre patients and their welfare.
KPHMN is a non-profit organization fully accredited by the Nepali government and aids in the health and well being of more then 3700 people in the Beni VDC of the Solukhumbu district in Nepal. KPHMN provides a medical service which otherwise would be unavailable to this large isolated community.
Future Plan of KPHMN










Cost Estimates ( Nepalese Rupees)for new Junbesi Hospital Building
S.No. |
Particulars |
Unit |
Quantity |
Rate |
Amount |
1 |
Earthwork excavation |
Cu.ft. |
42044.00 |
6.00 |
252,264.00 |
2 |
Stone masonry with mud mortar |
Cu.ft. |
21340.00 |
32.00 |
682,880.00 |
3 |
Plaster work with Cement mortar |
Sq.ft. |
11161.00 |
73.00 |
814,753.00 |
4 |
Wood works for window frame |
Cu.ft. |
132.30 |
625.00 |
82,687.50 |
5 |
Wood works for Floor & Roof |
Cu.ft. |
934.02 |
600.00 |
560,412.00 |
6 |
Window Glass shutter |
Sq..ft. |
502.50 |
125.00 |
62,812.50 |
7 |
Shutter Door Panel |
Sq..ft. |
350.00 |
160.00 |
56,000.00 |
8 |
C.G.I Color Sheet |
Sq..ft. |
7780.00 |
55.00 |
427,900.00 |
9 |
a) Bath room wall luster tile fitting |
Sq..ft. |
478.00 |
125.00 |
59,750.00 |
|
b) Bath room Floor tile |
Sq..ft. |
190.00 |
135.00 |
25,650.00 |
10 |
5mm thick Window glass |
Sq..ft. |
502.00 |
95.00 |
47,690.00 |
11 |
Toilet Pan with Accessories |
No. |
2.00 |
8500.00 |
17,000.00 |
12 |
Commode with Accessories |
No. |
3.00 |
12500.00 |
37,500.00 |
13 |
Wash basin with Accessories |
No. |
6.00 |
3500.00 |
21,000.00 |
14 |
G.I. Pipe 1" Fitting with Accessories |
m. |
150.00 |
240.00 |
36,000.00 |
15 |
G.I. Pipe 0.50" Fitting with Accessories |
m. |
200.00 |
195.00 |
39,000.00 |
16 |
Furniture |
— |
— |
— |
— |
|
a) Chair |
No. |
35.00 |
1500.00 |
52,500.00 |
|
b) Table |
No. |
20.00 |
3500.00 |
70,000.00 |
|
c) Cupboard |
No. |
25.00 |
6000.00 |
150,000.00 |
|
d) Refrigerator |
No. |
3.00 |
55000.00 |
165,000.00 |
|
e) Kitchen Sink Lab |
No. |
1.00 |
7000.00 |
7,000.00 |
|
f) Kitchen Sink + Lab |
No. |
2.00 |
3500.00 |
7,000.00 |
|
g) Kitchen equipment |
!shate |
|
|
90,000.00 |
|
h)Bed |
No. |
30.00 |
3500.00 |
105,000.00 |
17 |
Painting Works |
1 Job |
|
|
150,000.00 |
18 |
Miscellaneous Works |
- |
|
|
225,000.00 |
Total Amount Rs. |
4,244,799.00 |
US $ |
60,639.99 |
Junbesi Hospital Block Mesurement Detail.
|
|
|
|
|
|
|
S. No. Particulars |
Unit |
Length |
Breadth |
Height |
No |
Quantity |
1) Earth work excavation works |
|
Sec. Are |
Men Are |
Dis |
|
|
Section at -C, for Staff quarter |
Cu.ft. |
146.00 |
|
|
|
|
Section at -D |
Cu.ft. |
225.00 |
185.50 |
26.00 |
1 |
4823.00 |
Section at -E |
Cu.ft. |
129.00 |
177.00 |
16.00 |
1 |
2832.00 |
Section at -F |
Cu.ft. |
172.00 |
150.50 |
16.00 |
1 |
2408.00 |
Section at -G |
Cu.ft. |
212.00 |
192.00 |
19.00 |
1 |
3648.00 |
Hospital block section at -E |
Cu.ft. |
203.00 |
|
|
|
|
Section at -F |
Cu.ft. |
204.00 |
203.50 |
21.00 |
1 |
4273.50 |
Section at -G |
Cu.ft. |
187.00 |
195.50 |
16.00 |
1 |
3128.00 |
Section at -H |
Cu.ft. |
260.00 |
223.50 |
16.00 |
1 |
3576.00 |
Section at -I |
Cu.ft. |
315.00 |
287.50 |
16.00 |
1 |
4600.00 |
Foundation excavation |
|
|
|
|
|
|
Long wall |
Cu.ft. |
68.00 |
4.00 |
4.00 |
4 |
4352.00 |
Short wall |
Cu.ft. |
16.00 |
4.00 |
4.00 |
12 |
3072.00 |
Public toilet |
Cu.ft. |
16.50 |
3.00 |
2.50 |
2 |
247.50 |
|
Cu.ft. |
10.00 |
3.00 |
2.50 |
4 |
300.00 |
Staff Quarter |
Cu.ft. |
81.00 |
4.00 |
4.00 |
2 |
2592.00 |
short wall |
Cu.ft. |
16.00 |
4.00 |
4.00 |
8 |
2048.00 |
Partation wall for toilet |
Cu.ft. |
6.00 |
3.00 |
4.00 |
2 |
144.00 |
Total Earth work excavation |
Cu.ft. |
|
|
|
|
42044.00 |
2) Stone masonry wall with mud mortar |
Cu.ft. |
|
|
|
|
|
Long wall foundation |
Cu.ft. |
68.00 |
2.50 |
2.00 |
4 |
1360.00 |
Short wall |
Cu.ft. |
16.00 |
2.50 |
2.00 |
12 |
960.00 |
Passage wall |
Cu.ft. |
6.00 |
3.50 |
2.00 |
2 |
84.00 |
Long wall up to D.P.C Level |
Cu.ft. |
66.00 |
2.00 |
4.00 |
4 |
2112.00 |
Short wall |
Cu.ft. |
14.00 |
2.00 |
4.00 |
12 |
1344.00 |
Passaye wall |
Cu.ft. |
6.00 |
2.00 |
4.00 |
2 |
96 00 |
Long wall superstructure |
Cu.ft. |
65.00 |
1.50 |
8.00 |
2 |
1560.00 |
Long wall at Middle |
Cu.ft. |
65.00 |
1.50 |
12.00 |
2 |
2340 00 |
Short wall |
Cutt. |
10.00 |
1.50 |
8.00 |
12 |
1440.00 |
Passage wall |
Cu.ft. |
6.00 |
1.50 |
8.00 |
2 |
144.00 |
Slope wall |
Cu.ft. |
0.50*15. |
00 * 6.00 * |
1.50 |
4 |
270.00 |
Long wall for Varandah |
Cu.ft. |
79.00 |
2.00 |
5.00 |
1 |
790.00 |
Short wall |
Cu.ft. |
41.00 |
2.00 |
5.00 |
2 |
820.00 |
Staff Quater Block |
|
|
|
|
|
|
Long wall for foundation |
Cu.ft. |
81.00 |
2.50 |
2.00 |
2 |
810.00 |
Short wall |
Cu.ft. |
19.00 |
2.50 |
2.00 |
7 |
665.00 |
Long wall |
Cu.ft. |
80.00 |
2.00 |
4.00 |
2 |
1280.00 |
Short wall |
Cu.ft. |
1800 |
2.00 |
4 00 |
7 |
1008.00 |
Long wall for superstructure |
Cu.ft. |
78.00 |
1.50 |
8.00 |
2 |
1872.00 |
Short wall |
Cult. |
13.00 |
1.50 |
8.00 |
7 |
1092.00 |
Slope wall |
Cu.ft. |
0.50*8.00*3.50*1 |
.50 |
4 |
84.00 |
L ong wall for Varandah |
Cu.ft. |
83 00 |
2.00 |
4.00 |
1 |
664.00 |
Short wall |
Cu.ft. |
6 00 |
2.00 |
4.00 |
2 |
96.00 |
Public toilet long wall |
Cu.ft. |
16.50 |
2.00 |
4.00 |
2 |
264.00 |
Long wall |
Cu.ft. |
16.00 |
1.50 |
6.00 |
1 |
144.00 |
|
Cu.ft. |
13.00 |
1.50 |
8.00 |
1 |
156.00 |
Short wall |
Cu.ft. |
10.00 |
2.00 |
4.00 |
4 |
320.00 |
|
Cu.ft. |
10.00 |
1.50 |
7.00 |
4 |
420.00 |
Deduction W1 |
Cu.ft. |
-4.00 |
1.50 |
4.00 |
14 |
-336.00 |
D/W |
Cu.ft. |
-4.00 |
1.50 |
7.00 |
1 |
-42.00 |
|
Cu.ft. |
-3.00 |
1.50 |
4.00 |
2 |
-36.00 |
D |
Cu.ft. |
-3.00 |
1.50 |
7.00 |
14 |
-441.00 |
Total Quantity |
Cu.ft. |
|
|
|
|
21340.00 |
Plaster works with Cement mortar |
Sq.ft. |
|
|
|
|
|
Hospital Block Long wall in side |
Sq.ft. |
56.00 |
1.00 |
8.00 |
4 |
1792.00 |
Long wall out side |
Sq.ft. |
65.00 |
1.00 |
8.00 |
4 |
2080.00 |
Short wall |
Sq.ft. |
10.00 |
1.00 |
8.00 |
20 |
1600.00 |
Short wall Outside with passage |
Sq.ft. |
16.00 |
1.00 |
8.00 |
2 |
256.00 |
Passage wall in side |
Sq.ft. |
6.00 |
1.00 |
8.00 |
2 |
96.00 |
Slope part |
Sq.ft. |
0.50*16.00 |
*6.00 |
|
8 |
384.00 |
Peti wall |
Sq.ft. |
95.00 |
1.00 |
3.00 |
1 |
285.00 |
Public toilet long wall out side |
Sq.ft. |
16.00 |
1.00 |
7.50 |
1 |
120.00 |
|
Sq.ft. |
16.00 |
1.00 |
10.00 |
1 |
160.00 |
Long wall in side |
Sq.ft. |
10.00 |
1.00 |
7.00 |
2 |
140.00 |
Short wall in side |
Sq.ft. |
10.00 |
1.00 |
7.00 |
4 |
280.00 |
Short wall outside |
Sq.ft. |
13.00 |
1.00 |
9.00 |
2 |
234 00 |
Staff Quarter Long wall in side |
Sq.ft. |
66.00 |
1.00 |
8.00 |
2 |
1056.00 |
Long wall out side |
Sq.ft. |
7800 |
1.00 |
8.00 |
2 |
1248.00 |
Short wall in side |
Sq.ft. |
13.00 |
1.00 |
8.00 |
14 |
1456.00 |
Short wall out side |
Sq.ft. |
16.00 |
1.00 |
8.00 |
2 |
256.00 |
Pertation wall |
Sq.ft. |
5.50 |
1.00 |
8.00 |
4 |
176.00 |
Slope part |
Sq.ft. |
0.50 * 8.00* |
3.50 |
|
8 |
112.00 |
Deduction W1 |
Sq.ft. |
-4.00 |
1.00 |
4.00 |
14 |
-224.00 |
D/W |
Sq.ft. |
-4.00 |
1.00 |
7.00 |
1 |
-28.00 |
|
Sq.ft. |
-3.00 |
1.00 |
4.00 |
2 |
-24.00 |
D |
Sq.ft. |
-3.00 |
1.00 |
7.00 |
14 |
-294.00 |
Total Quantity |
Sq.ft. |
|
|
|
|
11161.00 |
Wood for Window Frame |
Cu.ft. |
4.00 |
0.42 |
0.42 |
100 |
70.56 |
Door Frame |
Cu.ft. |
7.00 |
0.42 |
0.42 |
40 |
49.39 |
|
Cu.ft. |
3.50 |
0.42 |
0.42 |
20 |
12.35 |
Total Quantity |
Cu.ft. |
|
|
|
|
132.30 |
Wood for Floor & Roof |
Cu.ft. |
|
|
|
|
|
Floor Joist |
Cu.ft. |
10.00 |
0.42 |
0.42 |
56 |
98.78 |
|
Cu.ft. |
6.00 |
0.42 |
0.42 |
20 |
21.17 |
Varandah |
Cu.ft. |
7.00 |
0.42 |
0.42 |
21 |
25.93 |
|
Cu.ft. |
13.00 |
0.42 |
0.42 |
30 |
68.80 |
Varandah |
Cu.ft. |
5.00 |
0.42 |
0.42 |
22 |
19.40 |
Planks 1" thick for Hospital block |
Cu.ft. |
56.00 |
36 00 |
0.08 |
1 |
161.28 |
For Staff Quarter |
Cu.ft. |
66.00 |
19.00 |
0.08 |
1 |
100.32 |
Support Post At verandah |
Cu.ft. |
6.50 |
050 |
0.50 |
15 |
24.38 |
| Rafter for Hospital block |
Cu.ft. |
21.00 |
0.42 |
0.33 |
42 |
122.25 |
| Varandah roof |
Cu.ft. |
10.00 |
0.42 |
0.33 |
21 |
29.11 |
| Staff Quarter |
Cu.ft. |
11.75 |
0.42 |
0.33 |
40 |
65.14 |
| Varandah |
Cu.ft. |
9.00 |
0.42 |
0.33 |
20 |
24.95 |
| Public toilet |
Cu.ft. |
7.00 |
0.42 |
0.33 |
12 |
11.64 |
| Purlin for Hospital block |
Cu.ft. |
81.00 |
0.25 |
0.25 |
16 |
81.00 |
| Staff Quarter |
Cu.ft. |
84.00 |
0.25 |
0.25 |
14 |
73.50 |
| Public toilet |
Cu.ft. |
17.00 |
0.25 |
0.25 |
6 |
6.38 |
| Total Quantity |
Cu.ft. |
|
|
|
|
934.02 |
| |
|
|
|
|
|
|
| 6)Window Glass Shutter |
Sq.ft. |
3.00 |
1.00 |
4.00 |
40 |
480.00 |
| Ventilation |
Sq.ft. |
3.00 |
1.00 |
1.50 |
5.00 |
22.50 |
| Total quantity |
Sq.ft. |
|
|
|
|
502.50 |
| |
|
|
|
|
|
|
| 7) Penal Door shutter |
Sq.ft. |
4.00 |
1.00 |
7.00 |
2 |
56.00 |
| |
Sq.ft. |
3.00 |
1.00 |
7.00 |
14 |
294.00 |
| Total Quantity |
Sq.ft. |
|
|
|
|
350.00 |
| |
|
|
|
|
|
|
| 8) C.G.I. Colar Sheet |
|
|
|
|
|
|
| Hospital block Roof |
Sq.ft. |
81.00 |
21.00 |
1.00 |
2 |
3402.00 |
| Varandah |
Sq.ft. |
81.00 |
10.00 |
1.00 |
1 |
810.00 |
| Staff Quarters |
Sq.ft. |
84.00 |
11.00 |
1.00 |
2 |
1848.00 |
| Varandah |
Sq.ft. |
84.00 |
9.00 |
1.00 |
1 |
756.00 |
| Ridge Cover |
Sq.ft. |
81.00 |
4.00 |
1.00 |
1 |
324.00 |
| |
Sq.ft. |
84.00 |
4.00 |
1.00 |
1 |
336.00 |
| Public toilet Total |
Sq.ft. |
19.00 |
8.00 |
1.00 |
2 |
304.00 |
| Total Quantity |
Sq.ft. |
|
|
|
|
7780.00 |
| |
|
|
|
|
|
|
| 9) Bath room Luster Tile works |
Sq.ft. |
|
|
|
|
|
| Public toilet wall tile |
Sq.ft. |
10.00 |
1 00 |
5.00 |
4.00 |
200.00 |
| |
Sq.ft. |
5.00 |
1.00 |
5.00 |
4.00 |
100.00 |
| Floor tile |
Sq.ft. |
10.00 |
5.00 |
1.00 |
2.00 |
-100.00 |
| Basin area |
Sq.ft. |
11.00 |
2.00 |
1.00 |
1.00 |
22.00 |
| Staff quarter bath room |
Sq.ft. |
6.00 |
1.00 |
5.00 |
6.00 |
180.00 |
| |
Sq.ft. |
5.00 |
1.00 |
5.00 |
6.00 |
150.00 |
| Floor Tile |
Sq.ft. |
6.00 |
5.00 |
1.00 |
3.00 |
-90.00 |
| Basin Area |
Sq.ft. |
8.00 |
1.00 |
2.00 |
1.00 |
16.00 |
| a. Total Wall Tile |
Sq.ft. |
|
|
|
|
478.00 |
| b. Total Floor Tile |
Sq.ft. |
|
|
|
|
190.00 |
| 10) 5mm thick window glass |
Sq.ft. |
|
|
|
|
502.00 |
| 11) Pan shate for Public toilet |
No |
|
|
|
|
2.00 |
| 12) Combote shate for Staff quarter |
No |
|
|
|
|
3.00 |
| 13) Wash Basin with accessories |
No |
|
|
|
|
6.00 |
| 14) G. I. Pipe 1" |
M. |
|
|
|
|
150.00 |
| 15) G. I. Pipe 0.50" |
M |
|
|
|
|
200.00 |
| 16) Furniture |
|
|
|
|
|
|
| a) Chair |
No |
|
|
|
|
65.00 |
| b) Table |
No |
|
|
|
|
35.00 |
| c) Daraje |
No |
|
|
|
|
25.00 |
| d) Refrigerator |
No |
|
|
|
|
3.00 |
| e) Kitchen Table |
No |
|
|
|
|
1.00 |
| f) Kitchen Sink |
No |
|
|
|
|
1.00 |
| g) Kitchen equipment |
1shate |
|
|
|
|
1.00 |
| h) Bade |
No |
|
|
|
|
8.00 |
we thank you for any assistance you are able to provide.
Namaste
If Anyone is keen to participate any kind of help, then Please contact us by post, phone or email.
Office
Kushudebu Public Health Mission Nepal
Chhetrapati-16, Paknajol Marga
Post
G.P.O. Box 13418
Kathmandu
Nepal
Telephone
+977-1-4253929
or
E-mail
kushudebu@mail.com.np
Banking Detail
Kushudebu Public Health Mission Nepal
Himalayan Bank, Tridevi Marg, Thamel
Current A/C No. 001-01417120018
Kathmandu, Nepal
Telex No. 2789 HIBA NP
SWIFT: HIMANPKA
For AUD Transfer